Kitchen renovation in Geneva: the room first, then the fitting
You choose your kitchen from the supplier you prefer or from our partner. We renovate the room around it and coordinate the fitting, so that it arrives in a room that is ready.
from CHF 12’000 · 1 to 3 weeks
Typical schedule: Kitchen
Diamonds: milestones checked with the client
- Milestone 2: Quote and schedule signed (Done)
- Milestone 3: Demolition and services inspected (Done)
- Milestone 4: Finishes installed (Planned)
- Milestone 5: Handover and acceptance report (Planned)
-
W 1 · Demolition
2 days Done -
W 1 · Electrics
3 days Done -
W 1 · Plumbing
2 days Done -
W 2 · Plastering and painting
3 days In progress -
W 2 · Splashback and floor
2 days Planned -
W 2 · Kitchen fitting
3 days Planned -
W 3 · Worktop and finishing
2 days Planned -
W 3 · Cleaning and handover
1 day Planned
01 Trades
The trades, in order
One contract, one project manager. Our own teams and our partner trades come in this order:
- 01
Demolition
Removing the old kitchen, splashback and floor, and opening a partition if the project includes it.
- 02
Electrics
Dedicated circuits for the hob, oven and dishwasher, worktop lighting, consumer unit upgrade.
- 03
Plumbing
Water supplies and sink drain, dishwasher connection.
- 04
Plastering and painting
Walls and ceiling made good, chases filled.
- 05
Tiling and floors
Kitchen floor, and the splashback if it is tiled.
- 06
Kitchen fitting
By our partner kitchen company or your own, on the date set in the schedule.
- 07
Worktop and finishing
Worktop templated and fitted, final connections, handover.
02 Typical schedule
The typical schedule, week by week
Indicative durations for a standard project, confirmed after the visit.
Kitchen Duration of the works: 1 to 3 weeks
- Demolition and removal
- Plumbing
- Electrics
- Tiling
- Plastering and painting
- Kitchen fitting (partner)
- Fittings and finishing
- Cleaning and handover
- M2 · 20%
- M3 · 30%
- M4 · 30%
- M5 · 15%
Can we stay at home? Yes, with a temporary kitchen.
On request, we set up a temporary kitchen in another room: a sink on a cabinet, a two-ring electric hob and your fridge. It stays in place until handover.
- Temporary kitchen set up on day one
- Living room protected if the kitchen is open-plan
- Water and power cuts announced the day before
03
We renovate the room, the kitchen company fits the kitchen
Choosing the fronts, appliances and layout is the kitchen company’s job. Ours is to hand over a room that is ready: services in the right place, straight walls, finished floor, properly sized electrical circuits.
We work from the kitchen designer’s plan from the first visit. Water supplies, sockets and the extractor duct are positioned from that plan, then checked with you at milestone 3.
- Kitchen designer’s plan built into the quote
- One fitting date, kept to in the schedule
- Opening onto the living room: we check whether the wall is load-bearing
04 Indicative prices
from CHF 12’000
Renovating the room: demolition, services, electrics, walls and floor. Units and appliances not included.
incl. 8.1% VAT, coordination fees included.
Example: a 9 m² kitchen opened onto the living room, load-bearing wall kept, new floor and splashback: CHF 16’800, kitchen units not included.
What affects the price
- Opening up a partition (and any permit it needs)
- Upgrading the consumer unit
- Moving the sink and the extractor hood
- The floor covering chosen
Orders to place early
A kitchen is ordered 6 to 12 weeks before fitting. We time the demolition to the confirmed delivery date, so the room is never out of use for longer than necessary.
- Kitchen and appliances: delivery date confirmed before demolition
- Stone worktop: templated after the units are fitted (1 to 2 extra weeks)
- Splashback or floor tiles
Delivery times of up to 12 weeks (source: homegate.ch).
05 Projects
Planned duration, actual duration
-
Kitchen · Nyon
Kitchen opened onto the living room in Nyon
A non-load-bearing partition removed to open the kitchen onto the living room, with a temporary kitchen set up in the dining room.
- Planned
- 3 weeks
- Actual
- 3.4 weeks
-
Kitchen · Chêne-Bougeries
Family house kitchen in Chêne-Bougeries
A 1969 kitchen renovated in two and a half weeks while the family lived in the house.
- Planned
- 2.5 weeks
- Actual
- 2.5 weeks
06 Questions
Frequently asked questions
Do you sell kitchens?
No. We renovate the room and coordinate the fitting. You choose your kitchen from the supplier you prefer, or from our partner if you would rather have a single contract.
How much does renovating the room cost?
From CHF 12’000 including VAT, excluding units and appliances, for a 6 to 10 m² kitchen. Opening a partition and upgrading the consumer unit affect the price.
Can the kitchen be opened onto the living room?
Often, yes. We first check whether the wall is load-bearing and whether a permit is needed (in Geneva, an internal alteration usually goes through the fast-track procedure).
Our other renovations
-
2 to 4 weeks
Bathroom
Level-access shower, waterproofing, risers and ventilation, with a shower room you can use every evening.
from CHF 18’000 incl. 8.1% VAT
-
6 to 12 weeks
Full renovation
Reconfiguring rooms, electrics, floors, internal insulation: 6 to 12 weeks, one contract.
from CHF 1’000 per m² incl. 8.1% VAT