from CHF 12’000 · 1 to 3 weeks

Typical schedule: Kitchen

Diamonds: milestones checked with the client

  • Milestone 2: Quote and schedule signed (Done)
  • Milestone 3: Demolition and services inspected (Done)
  • Milestone 4: Finishes installed (Planned)
  • Milestone 5: Handover and acceptance report (Planned)
  1. Kitchen room stripped back to bare walls, with a ladder W 1 · Demolition
    2 days Done
  2. Electrician seen from behind, crouching by a socket in an older apartment W 1 · Electrics
    3 days Done
  3. New grey PVC drain pipes W 1 · Plumbing
    2 days Done
  4. Plasterboard being fixed to a wall W 2 · Plastering and painting
    3 days In progress
  5. Tiles laid with levelling clips W 2 · Splashback and floor
    2 days Planned
  6. White and wood kitchen fitted, open to the hallway W 2 · Kitchen fitting
    3 days Planned
  7. Open kitchen with an island and worktop W 3 · Worktop and finishing
    2 days Planned
  8. Site vacuum in a corner by a freshly painted green wall W 3 · Cleaning and handover
    1 day Planned

01 Trades

The trades, in order

One contract, one project manager. Our own teams and our partner trades come in this order:

  1. 01

    Demolition

    Removing the old kitchen, splashback and floor, and opening a partition if the project includes it.

  2. 02

    Electrics

    Dedicated circuits for the hob, oven and dishwasher, worktop lighting, consumer unit upgrade.

  3. 03

    Plumbing

    Water supplies and sink drain, dishwasher connection.

  4. 04

    Plastering and painting

    Walls and ceiling made good, chases filled.

  5. 05

    Tiling and floors

    Kitchen floor, and the splashback if it is tiled.

  6. 06

    Kitchen fitting

    By our partner kitchen company or your own, on the date set in the schedule.

  7. 07

    Worktop and finishing

    Worktop templated and fitted, final connections, handover.

02 Typical schedule

The typical schedule, week by week

Indicative durations for a standard project, confirmed after the visit.

Calculate the schedule for my project

Kitchen Duration of the works: 1 to 3 weeks

  • Demolition and removal 1–2 d
  • Plumbing 1–2 d
  • Electrics 2–3 d
  • Tiling 1–2 d
  • Plastering and painting 1–2 d
  • Kitchen fitting (partner) 2–3 d
  • Fittings and finishing 1 d
  • Cleaning and handover 1–2 d
  • M2 · 20%
  • M3 · 30%
  • M4 · 30%
  • M5 · 15%

Can we stay at home? Yes, with a temporary kitchen.

On request, we set up a temporary kitchen in another room: a sink on a cabinet, a two-ring electric hob and your fridge. It stays in place until handover.

  • Temporary kitchen set up on day one
  • Living room protected if the kitchen is open-plan
  • Water and power cuts announced the day before

03

We renovate the room, the kitchen company fits the kitchen

Choosing the fronts, appliances and layout is the kitchen company’s job. Ours is to hand over a room that is ready: services in the right place, straight walls, finished floor, properly sized electrical circuits.

We work from the kitchen designer’s plan from the first visit. Water supplies, sockets and the extractor duct are positioned from that plan, then checked with you at milestone 3.

  • Kitchen designer’s plan built into the quote
  • One fitting date, kept to in the schedule
  • Opening onto the living room: we check whether the wall is load-bearing

04 Indicative prices

from CHF 12’000

Renovating the room: demolition, services, electrics, walls and floor. Units and appliances not included.

incl. 8.1% VAT, coordination fees included.

Example: a 9 m² kitchen opened onto the living room, load-bearing wall kept, new floor and splashback: CHF 16’800, kitchen units not included.

What affects the price

  • Opening up a partition (and any permit it needs)
  • Upgrading the consumer unit
  • Moving the sink and the extractor hood
  • The floor covering chosen

Orders to place early

A kitchen is ordered 6 to 12 weeks before fitting. We time the demolition to the confirmed delivery date, so the room is never out of use for longer than necessary.

  • Kitchen and appliances: delivery date confirmed before demolition
  • Stone worktop: templated after the units are fitted (1 to 2 extra weeks)
  • Splashback or floor tiles

Delivery times of up to 12 weeks (source: homegate.ch).

05 Projects

Planned duration, actual duration

See all projects
  • Kitchen open to the living room, with pendant lights and pale parquet Kitchen · Nyon

    Kitchen opened onto the living room in Nyon

    A non-load-bearing partition removed to open the kitchen onto the living room, with a temporary kitchen set up in the dining room.

    Planned
    3 weeks
    Actual
    3.4 weeks
  • Light kitchen open to the dining area, oak parquet Kitchen · Chêne-Bougeries

    Family house kitchen in Chêne-Bougeries

    A 1969 kitchen renovated in two and a half weeks while the family lived in the house.

    Planned
    2.5 weeks
    Actual
    2.5 weeks

06 Questions

Frequently asked questions

Do you sell kitchens?

No. We renovate the room and coordinate the fitting. You choose your kitchen from the supplier you prefer, or from our partner if you would rather have a single contract.

How much does renovating the room cost?

From CHF 12’000 including VAT, excluding units and appliances, for a 6 to 10 m² kitchen. Opening a partition and upgrading the consumer unit affect the price.

Can the kitchen be opened onto the living room?

Often, yes. We first check whether the wall is load-bearing and whether a permit is needed (in Geneva, an internal alteration usually goes through the fast-track procedure).

Our other renovations

  • 2 to 4 weeks

    Bathroom

    Level-access shower, waterproofing, risers and ventilation, with a shower room you can use every evening.

    from CHF 18’000 incl. 8.1% VAT

  • 6 to 12 weeks

    Full renovation

    Reconfiguring rooms, electrics, floors, internal insulation: 6 to 12 weeks, one contract.

    from CHF 1’000 per m² incl. 8.1% VAT

Milestone 01

Let’s start with a visit

Free and without obligation. A project manager comes to measure, listens to your constraints and tells you honestly what is feasible, and in how many weeks.

Request a visit for your kitchen

Office Mon–Fri 7.30 am–12.00 pm / 1.30–5.30 pm

Call WhatsApp