Bathroom in a 1965 building in Champel
A bath replaced by a level-access shower in an occupied apartment. The toilet was back in service every evening.
- Planned
- 3.5 weeks
- Actual
- 3.8 weeks
Demo website by Sitli · Fictitious companySitli demo · Fictitious company
I want one like thisTen projects in Geneva and on La Côte. For each one: the starting point, the trades we coordinated, and the gap between planned and actual duration, explained.
A bath replaced by a level-access shower in an occupied apartment. The toilet was back in service every evening.
A family relocating from abroad bought an older three-bedroom apartment. We visited it before the purchase and renovated it between signing and moving in.
A non-load-bearing partition removed to open the kitchen onto the living room, with a temporary kitchen set up in the dining room.
Renovation of the entrance hall of a 24-flat building, done in halves to keep access to the letterboxes and the lift.
For a property management agency: a two-bedroom flat refurbished in four weeks between one tenant leaving and the next moving in, with the LDTR application prepared in advance.
Two shower rooms renovated one after the other, so that the family always had a shower in the house.
For a firm of architects: general contracting for a reconfiguration, with a study created in the former kitchen.
A 1969 kitchen renovated in two and a half weeks while the family lived in the house.
A 6 m² bathroom in a 1991 building: no compulsory asbestos survey, and three weeks on site as planned.
The upper floor of a 1934 house renovated while the family lived downstairs: internal insulation, electrics, bathroom and parquet floors.
No project matches these filters.
Milestone 01
Free and without obligation. A project manager comes to measure, listens to your constraints and tells you honestly what is feasible, and in how many weeks.
Office Mon–Fri 7.30 am–12.00 pm / 1.30–5.30 pm