Skip to content

Sitli demo · Fictitious company

I want one like this
Jalon Renovation Visit

Renovation in Geneva: one contact, one schedule you can trust

Line-by-line quote Milestone payments Reply within 48 hours

Three-bedroom apartment in Carouge, week 3 of 8

Diamonds: milestones checked with the client

  • Milestone 2: Quote and schedule signed (Done)
  • Milestone 3: Demolition and services inspected (Done)
  • Milestone 4: Finishes installed (Planned)
  • Milestone 5: Handover and acceptance report (Planned)
  1. Old wall tiles half removed above a bare wall W 1 · Demolition
    4 days Done
  2. Electrical boxes set into a freshly plastered wall W 1 · Electrics
    6 days Done
  3. New grey PVC drain pipes along a wall W 2 · Plumbing
    5 days Done
  4. Surface of a freshly laid screed W 3 · Screed and waterproofing
    7 days In progress
  5. Tiler laying large grey tiles with levelling clips W 4 · Tiling
    6 days Planned
  6. Painter using a roller in a room with pale grey walls W 5 · Plastering and painting
    7 days Planned
  7. Protective sheet and paint tin on a parquet floor W 6 · Flooring
    5 days Planned
  8. Site vacuum cleaner on a clean floor at the end of the works W 7 · Cleaning and handover
    3 days Planned

Jalon in figures

General contractor since
2009
projects completed
420
partner trades coordinated
18
for a first reply
48 h
working days for the quote after the visit
10

01 Renovations

Three kinds of project, the same reliable schedule

Indicative “from” prices, VAT and coordination fees included. The fixed price is in the quote, 10 working days after the visit.

  • 2 to 4 weeks

    Bathroom

    Level-access shower, waterproofing, risers and ventilation, with a shower room you can use every evening.

    from CHF 18’000 incl. 8.1% VAT

  • 1 to 3 weeks

    Kitchen

    Demolition, services, electrics, floors and walls, then fitting coordinated with the kitchen supplier.

    from CHF 12’000 incl. 8.1% VAT, excluding units and appliances

  • 6 to 12 weeks

    Full renovation

    Reconfiguring rooms, electrics, floors, internal insulation: 6 to 12 weeks, one contract.

    from CHF 1’000 per m² incl. 8.1% VAT

02 Commitments

Six commitments, written into the contract

  1. 01

    A line-by-line quote

    Removal, preparation, materials, installation and finishing, item by item. Coordination fees (10% on average) are included and shown.

  2. 02

    A fixed price, no extras without a signed variation

    If something unexpected turns up (a pipe to replace behind a wall), we price it and you sign before we do the work.

  3. 03

    Milestone payments, with receipts

    You pay for a stage once you have seen it on site. Before each payment, you receive the receipts from our partner trades.

  4. 04

    A shared schedule, updated every Friday

    Every Friday, Inès, our scheduling coordinator, sends you the plan for the following week: who is coming, when, and what will be done.

  5. 05

    A site cleaned every evening

    Floors protected, dust screens up, waste removed every day. If you stay at home, a shower room remains usable.

  6. 06

    Guarantees set out in plain words

    Deadlines for reporting defects, the 2-year guarantee, protection against builders’ liens: everything is in writing before you sign.

03 Milestone payments

You only pay for work that is done

Each payment follows a milestone checked with you on site. Before you pay, you receive our partner trades’ receipts, so none of them can register a builders’ lien on your home.

The method and guarantees in detail
  1. Milestone 01

    Site visit and survey

    Free of charge

    0% paid at this stage

  2. Milestone 02

    Quote and schedule signed

    20% deposit

    20% paid at this stage

  3. Milestone 03

    Demolition and services inspected

    2nd payment: 30%

    50% paid at this stage

  4. Milestone 04

    Finishes installed

    3rd payment: 30%

    80% paid at this stage

  5. Milestone 05

    Handover and acceptance report

    Balance: 15% (the 5% retention stays with you)

    95% paid at this stage

  6. Milestone 06

    Two-year inspection

    Retention released: 5%

    100% paid at this stage

04 Planner

How many weeks for your project?

Pick a type of project to see its typical schedule. The full tool calculates yours from the floor area, the works and your home.

Open the full planner

Bathroom Duration of the works: 2 to 4 weeks

  • Demolition and removal 2–3 d
  • Plumbing 3–4 d
  • Electrics 1–2 d
  • Waterproofing and screed (drying) 3–7 d
  • Tiling 4–6 d
  • Plastering and painting 2–3 d
  • Fittings and finishing 2 d
  • Cleaning and handover 1–2 d
  • M2 · 20%
  • M3 · 30%
  • M4 · 30%
  • M5 · 15%

Kitchen Duration of the works: 1 to 3 weeks

  • Demolition and removal 1–2 d
  • Plumbing 1–2 d
  • Electrics 2–3 d
  • Tiling 1–2 d
  • Plastering and painting 1–2 d
  • Kitchen fitting (partner) 2–3 d
  • Fittings and finishing 1 d
  • Cleaning and handover 1–2 d
  • M2 · 20%
  • M3 · 30%
  • M4 · 30%
  • M5 · 15%

Whole apartment Duration of the works: 6 to 11 weeks

  • Demolition and removal 5–9.5 d
  • Partitions and light masonry 5–8 d
  • Plumbing 3–5 d
  • Electrics 7.5–12 d
  • Waterproofing and screed (drying) 3–7 d
  • Tiling 4–6.5 d
  • Plastering and painting 10–15.5 d
  • Flooring (parquet, coverings) 5–7.5 d
  • Kitchen fitting (partner) 2–3 d
  • Fittings and finishing 2.5 d
  • Cleaning and handover 1–2 d
  • M2 · 20%
  • M3 · 30%
  • M4 · 30%
  • M5 · 15%

05 Projects

Planned duration, actual duration

Each project page sets the signed schedule against the one we delivered, and explains any difference.

See all projects
  • Level-access shower in marble-effect porcelain with a glass screen and niche Bathroom · Champel

    Bathroom in a 1965 building in Champel

    A bath replaced by a level-access shower in an occupied apartment. The toilet was back in service every evening.

    Planned
    3.5 weeks
    Actual
    3.8 weeks
  • Living room with restored cornices, white walls and pale parquet Apartment · Carouge

    A 1910 apartment renovated before move-in in Carouge

    A family relocating from abroad bought an older three-bedroom apartment. We visited it before the purchase and renovated it between signing and moving in.

    Planned
    10 weeks
    Actual
    10 weeks
  • Kitchen open to the living room, with pendant lights and pale parquet Kitchen · Nyon

    Kitchen opened onto the living room in Nyon

    A non-load-bearing partition removed to open the kitchen onto the living room, with a temporary kitchen set up in the dining room.

    Planned
    3 weeks
    Actual
    3.4 weeks

06 For professionals

Property managers, condominiums, architects

See our offer for professionals

07 Reviews

What our clients say

Sample review · demo website

08 Questions

The five questions we are asked at every visit

How much does a renovation cost?

As a guide, VAT included: bathrooms from CHF 18’000, kitchen room renovation from CHF 12’000 excluding units and appliances, whole apartments from CHF 1’000 per m². The fixed price is set out in the quote, 10 working days after the visit.

How long do the works take?

Allow 2 to 4 weeks for a bathroom, 1 to 3 weeks for a kitchen and 6 to 12 weeks for a whole apartment. The planner gives you a week-by-week estimate for your project.

Can we stay at home during the works?

Yes for a bathroom or a kitchen: we phase the work so that a shower room stays usable, and set up a temporary kitchen if needed. For a whole apartment we advise against it: the work is quicker and cleaner in an empty home.

My building is older than 1991: what about asbestos?

In Geneva and in Vaud, an asbestos survey is compulsory before the works. We order it at the visit from a FACH-recognised firm. If removal is needed, it is done before the works start and built into the schedule.

What guarantees do I get after the works?

You have at least 60 days to report a defect from the day you discover it, and our contracts include the SIA 118 standard: a 2-year guarantee period during which you can report defects at any time, and a 5-year limitation period. A 5% retention stays with you until the two-year inspection.

Milestone 01

Let’s start with a visit

Free and without obligation. A project manager comes to measure, listens to your constraints and tells you honestly what is feasible, and in how many weeks.

Request a visit

Office Mon–Fri 7.30 am–12.00 pm / 1.30–5.30 pm

Call WhatsApp