Jalon Renovation Visit

Full apartment renovation in Geneva, turnkey

An older apartment in a condominium, a 1970s house: every trade comes through, often in a tight sequence. One project manager runs the schedule from the first strike of the hammer to handing back the keys.

from CHF 1’000 per m² · 6 to 12 weeks

Typical schedule: Full renovation

Diamonds: milestones checked with the client

  • Milestone 2: Quote and schedule signed (Done)
  • Milestone 3: Demolition and services inspected (Done)
  • Milestone 4: Finishes installed (Planned)
  • Milestone 5: Handover and acceptance report (Planned)
  1. Apartment being stripped out, brick walls exposed W 1 · Demolition
    5 days Done
  2. Plasterboard going up for a new partition W 1 · Partitions
    6 days Done
  3. Electrician seen from behind in a room of an older apartment W 2 · Electrics
    8 days Done
  4. Installer next to a radiator before reconnection W 3 · Plumbing
    5 days Done
  5. Combed adhesive and a tile laid W 4 · Screed and tiling
    8 days In progress
  6. Plasterer seen from behind working on the ceiling W 6 · Plastering and painting
    10 days Planned
  7. Parquet protected by a sheet during finishing work W 7 · Flooring
    7 days Planned
  8. Kitchen open to the living room, fitted W 8 · Kitchen (partner)
    5 days Planned
  9. Site vacuum by a freshly painted wall W 9 · Cleaning and handover
    4 days Planned

01 Trades

The trades, in order

One contract, one project manager. Our own teams and our partner trades come in this order:

  1. 01

    Demolition

    Removing floors, partitions, the kitchen and bathroom, and clearing the waste.

  2. 02

    Partitions and light masonry

    New partitions, openings and reinforcement, by our in-house team.

  3. 03

    Electrics

    Full upgrade, consumer unit, data network, final safety inspection report.

  4. 04

    Plumbing and heating

    Pipework, bathroom, kitchen, moving radiators.

  5. 05

    Screed, waterproofing and tiling

    Wet rooms, hallway, kitchen.

  6. 06

    Plastering and painting

    Ceilings, restored cornices, internal insulation, painting.

  7. 07

    Flooring

    Existing parquet sanded and oiled, or new parquet.

  8. 08

    Kitchen and finishing

    Kitchen fitting, appliances, cleaning and handover.

02 Typical schedule

The typical schedule, week by week

Indicative durations for a standard project, confirmed after the visit.

Calculate the schedule for my project

Whole apartment Duration of the works: 6 to 11 weeks

  • Demolition and removal 5–9.5 d
  • Partitions and light masonry 5–8 d
  • Plumbing 3–5 d
  • Electrics 7.5–12 d
  • Waterproofing and screed (drying) 3–7 d
  • Tiling 4–6.5 d
  • Plastering and painting 10–15.5 d
  • Flooring (parquet, coverings) 5–7.5 d
  • Kitchen fitting (partner) 2–3 d
  • Fittings and finishing 2.5 d
  • Cleaning and handover 1–2 d
  • M2 · 20%
  • M3 · 30%
  • M4 · 30%
  • M5 · 15%

Can we stay at home? We advise against it.

For a full renovation, an empty home saves 2 to 3 weeks and spares you living in the dust. If you have no other option, we phase the work room by room and the schedule grows by about 20%.

  • Empty home: quicker and cleaner works
  • Partner storage company if needed
  • Room-by-room phasing possible, about 20% longer

03

Buying? We visit before you sign

You have found an apartment in Geneva or on La Côte, but it needs everything redoing. We visit it with you before you buy and give you an estimate your bank can use, with an honest range and a list of the risks (asbestos, risers, wiring).

The works take place between signing at the notary’s office and your move-in date. We prepare the paperwork while the purchase goes through, so we can start on the day you get the keys.

  • Pre-purchase visit and estimate for your bank
  • Asbestos survey ordered as soon as the sale agreement is signed
  • Works timed to the key handover date

04 Indicative prices

from CHF 1’000 per m²

Older apartment: electrics, floors, painting, bathroom and kitchen (units excluded). Price per m² of living space.

incl. 8.1% VAT, coordination fees included.

Example: a 92 m² three-bedroom apartment in Carouge, renovated between purchase and move-in: CHF 118’000.

What affects the price

  • Reconfiguring rooms (partitions, permit)
  • The condition of the wiring and pipework
  • Floors (existing parquet sanded or new parquet)
  • Internal insulation and windows
  • A positive asbestos survey (removal before the works)

Orders to place early

On a 6 to 12-week project, orders are placed as soon as you sign and tracked in the shared schedule.

  • Tiles and sanitaryware
  • Kitchen (6 to 12 weeks)
  • New parquet
  • Internal doors and made-to-measure joinery

Delivery times of up to 12 weeks (source: homegate.ch).

05 Projects

Planned duration, actual duration

See all projects
  • Living room with restored cornices, white walls and pale parquet Apartment · Carouge

    A 1910 apartment renovated before move-in in Carouge

    A family relocating from abroad bought an older three-bedroom apartment. We visited it before the purchase and renovated it between signing and moving in.

    Planned
    10 weeks
    Actual
    10 weeks
  • Repainted apartment hallway with parquet and white doors Apartment · Eaux-Vives

    Refurbishment between two tenancies in Eaux-Vives

    For a property management agency: a two-bedroom flat refurbished in four weeks between one tenant leaving and the next moving in, with the LDTR application prepared in advance.

    Planned
    4 weeks
    Actual
    4 weeks

06 Questions

Frequently asked questions

How much does a full apartment renovation cost?

From CHF 1’000 per m² including VAT for an older apartment (electrics, floors, painting, bathroom and kitchen excluding units). Reconfiguring rooms or adding internal insulation increases the price.

Do I need a permit to move a partition?

It depends on the canton and the project. In Geneva, an internal alteration usually goes through the fast-track procedure (APA). In Vaud, light renovation without reconfiguration is exempt, while a major reconfiguration needs a permit. We check and prepare the application.

Can you run the project while I live abroad?

Yes. The Friday schedule update, photos at every milestone and a video call on site stand in for your presence. You sign any variations remotely.

Our other renovations

  • 2 to 4 weeks

    Bathroom

    Level-access shower, waterproofing, risers and ventilation, with a shower room you can use every evening.

    from CHF 18’000 incl. 8.1% VAT

  • 1 to 3 weeks

    Kitchen

    Demolition, services, electrics, floors and walls, then fitting coordinated with the kitchen supplier.

    from CHF 12’000 incl. 8.1% VAT, excluding units and appliances

Milestone 01

Let’s start with a visit

Free and without obligation. A project manager comes to measure, listens to your constraints and tells you honestly what is feasible, and in how many weeks.

Request a visit for your apartment