Jalon Renovation Visit

Apartment · Carouge · 2026

A 1910 apartment renovated before move-in in Carouge

A family relocating from abroad bought an older three-bedroom apartment. We visited it before the purchase and renovated it between signing and moving in.

Living room with restored cornices, white walls and pale parquet Apartment
Bedroom with sanded and oiled parquet in front of an old window Carouge

The starting point

The buyers, still living abroad, needed an estimate for their bank and a home ready on a fixed date, ten weeks after getting the keys.

What we did

  • Pre-purchase visit and estimate delivered in 8 working days, used for the mortgage application.
  • Asbestos survey ordered as soon as the sale agreement was signed: asbestos-containing floor adhesive removed before the works began.
  • A video call every Friday and photos at every milestone; variations signed remotely.

Trades coordinated

  1. 01 Demolition
  2. 02 Electrics
  3. 03 Plumbing
  4. 04 Tiling
  5. 05 Plastering and painting
  6. 06 Flooring
  7. 07 Kitchen (partner)

Planned schedule, actual schedule

  • Demolition Planned · 5 d Actual · 5 d
  • Electrics Planned · 11 d Actual · 12 d
  • Plumbing Planned · 8 d Actual · 8 d
  • Tiling Planned · 7 d Actual · 7 d
  • Plastering and painting Planned · 15 d Actual · 14 d
  • Flooring Planned · 8 d Actual · 7 d
  • Kitchen and handover Planned · 9 d Actual · 9 d

The gap, explained

Schedule kept, no gap.

Before and after

Before: a room with peeling plaster and a worn parquet Before
After: walls redone, parquet sanded and oiled After
Illustrative photos: the two images were not taken in the same place.

Similar projects

  • Repainted apartment hallway with parquet and white doors Apartment · Eaux-Vives

    Refurbishment between two tenancies in Eaux-Vives

    For a property management agency: a two-bedroom flat refurbished in four weeks between one tenant leaving and the next moving in, with the LDTR application prepared in advance.

    Planned
    4 weeks
    Actual
    4 weeks
  • Level-access shower in marble-effect porcelain with a glass screen and niche Bathroom · Champel

    Bathroom in a 1965 building in Champel

    A bath replaced by a level-access shower in an occupied apartment. The toilet was back in service every evening.

    Planned
    3.5 weeks
    Actual
    3.8 weeks

Milestone 01

A similar project?

Tell us about it: we will call you back within 48 hours to arrange a visit.

Request a visit