Apartment · Plainpalais · 2026
A reconfigured three-bedroom apartment in Plainpalais
For a firm of architects: general contracting for a reconfiguration, with a study created in the former kitchen.
The starting point
The architect had designed the project and obtained the permit. They were looking for a general contractor to carry out their specification, with a single point of contact on site.
What we did
- A dedicated project manager attending the architect’s weekly site meetings.
- Colours and skirting details approved on samples installed at milestone 3.
- Schedule kept, two days ahead.
Trades coordinated
- 01 Demolition
- 02 Partitions
- 03 Electrics
- 04 Plastering and painting
- 05 Flooring
- 06 Joinery (partner)
Planned schedule, actual schedule
- Demolition
- Partitions
- Electrics
- Plastering and painting
- Flooring
- Joinery and handover
The gap, explained
The existing herringbone parquet could be kept and sanded instead of replaced: two days saved.