Bathroom · Rolle · 2024

Grey bathroom in a condominium in Rolle

A 6 m² bathroom in a 1991 building: no compulsory asbestos survey, and three weeks on site as planned.

Bathroom with wave-textured grey tiles, a shower and a white basin Bathroom

The starting point

The owner wanted a simpler bathroom and a bigger shower, while keeping a bath for her grandchildren.

What we did

  • A larger shower in place of the old cabinet, with the bath kept and re-clad.
  • Textured tiles ordered at signature (8-week lead time).
  • Neighbours on the landing informed, with the schedule of noisy days.

Trades coordinated

  1. 01 Demolition
  2. 02 Plumbing
  3. 03 Electrics
  4. 04 Waterproofing
  5. 05 Tiling
  6. 06 Finishing

Planned schedule, actual schedule

  • Demolition Planned · 2 d Actual · 2 d
  • Plumbing and electrics Planned · 3.5 d Actual · 3.5 d
  • Waterproofing and tiling Planned · 7 d Actual · 7 d
  • Finishing and handover Planned · 3 d Actual · 3 d

The gap, explained

Schedule kept, no gap.

Similar projects

  • Level-access shower in marble-effect porcelain with a glass screen and niche Bathroom · Champel

    Bathroom in a 1965 building in Champel

    A bath replaced by a level-access shower in an occupied apartment. The toilet was back in service every evening.

    Planned
    3.5 weeks
    Actual
    3.8 weeks
  • Living room with restored cornices, white walls and pale parquet Apartment · Carouge

    A 1910 apartment renovated before move-in in Carouge

    A family relocating from abroad bought an older three-bedroom apartment. We visited it before the purchase and renovated it between signing and moving in.

    Planned
    10 weeks
    Actual
    10 weeks

Milestone 01

A similar project?

Tell us about it: we will call you back within 48 hours to arrange a visit.

Request a visit

Office Mon–Fri 7.30 am–12.00 pm / 1.30–5.30 pm

Call WhatsApp