Skip to content

Sitli demo · Fictitious company

I want one like this
Jalon Renovation Visit

Bathroom · Versoix · 2025

Two shower rooms in a 1978 house in Versoix

Two shower rooms renovated one after the other, so that the family always had a shower in the house.

White-tiled shower with a built-in bench and a border Bathroom
Bathroom with a grey vanity unit and a glazed shower Versoix

The starting point

A family of five, who could not move out, wanted to redo both of the house’s original shower rooms.

What we did

  • Phasing: the ground-floor shower room first, then the upstairs bathroom.
  • Asbestos survey before the works (1978 house) and targeted removal.
  • The same tiler for both rooms, for matching joints.

Trades coordinated

  1. 01 Demolition
  2. 02 Plumbing
  3. 03 Electrics
  4. 04 Waterproofing and screed
  5. 05 Tiling
  6. 06 Plastering and painting

Planned schedule, actual schedule

  • Ground-floor shower room Planned · 11 d Actual · 13 d
  • Upstairs bathroom Planned · 12 d Actual · 12 d
  • Handover Planned · 2 d Actual · 2 d

The gap, explained

The survey found asbestos in the tile adhesive of the ground-floor shower room: two days of removal, agreed by variation before demolition.

Similar projects

  • Level-access shower in marble-effect porcelain with a glass screen and niche Bathroom · Champel

    Bathroom in a 1965 building in Champel

    A bath replaced by a level-access shower in an occupied apartment. The toilet was back in service every evening.

    Planned
    3.5 weeks
    Actual
    3.8 weeks
  • Bathroom with wave-textured grey tiles, a shower and a white basin Bathroom · Rolle

    Grey bathroom in a condominium in Rolle

    A 6 m² bathroom in a 1991 building: no compulsory asbestos survey, and three weeks on site as planned.

    Planned
    3 weeks
    Actual
    3 weeks
  • Light kitchen open to the dining area, oak parquet Kitchen · Chêne-Bougeries

    Family house kitchen in Chêne-Bougeries

    A 1969 kitchen renovated in two and a half weeks while the family lived in the house.

    Planned
    2.5 weeks
    Actual
    2.5 weeks

Milestone 01

A similar project?

Tell us about it: we will call you back within 48 hours to arrange a visit.

Request a visit

Office Mon–Fri 7.30 am–12.00 pm / 1.30–5.30 pm

Call WhatsApp